{"id":204,"date":"2021-10-05T06:35:18","date_gmt":"2021-10-05T06:35:18","guid":{"rendered":"http:\/\/www.m4contracting.com\/beta_00\/?post_type=projects&#038;p=204"},"modified":"2022-03-09T12:53:00","modified_gmt":"2022-03-09T12:53:00","slug":"delma-sir-baniyas","status":"publish","type":"projects","link":"https:\/\/www.m4contracting.com\/de\/projects\/delma-sir-baniyas\/","title":{"rendered":"DELMA &#038; SIR BANIYAS"},"content":{"rendered":"<p><strong>CLIENT<\/strong><\/p>\n<hr \/>\n<p>M\/s. ADAC \u2013 Abu Dhabi Airports Company PJSC<\/p>\n<p><strong>DESCRIPTION<\/strong> :<\/p>\n<hr \/>\n<p>Design &amp; Build Airfield works at Delma and Sir Baniyas for M\/s. ADAC \u2013 Abu Dhabi Airports Company PJSC Terminal Phase for Al-Ain International Airport<\/p>\n<p><strong>LOCATION<\/strong> :<\/p>\n<hr \/>\n<p>Al-Ain International Airport<\/p>\n<p><strong>CONTRACTOR<\/strong> :<\/p>\n<hr \/>\n<p>M\/s. Masri Engineering &amp; Contracting Est.<\/p>\n<p><strong>SUB CONTRACTOR :<\/strong><\/p>\n<hr \/>\n<p>M\/s. M4 Contracting SARL<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Completed<\/p>\n","protected":false},"featured_media":205,"parent":0,"template":"","projects-categories":[3],"_links":{"self":[{"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/projects\/204"}],"collection":[{"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/media\/205"}],"wp:attachment":[{"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/media?parent=204"}],"wp:term":[{"taxonomy":"projects-categories","embeddable":true,"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/projects-categories?post=204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}