{"id":875,"date":"2022-03-10T12:12:51","date_gmt":"2022-03-10T12:12:51","guid":{"rendered":"http:\/\/www.m4contracting.com\/beta_00\/?post_type=projects&#038;p=875"},"modified":"2022-03-10T12:12:51","modified_gmt":"2022-03-10T12:12:51","slug":"renovation-of-basement-under-the-main-building-of-the-presidential-palace","status":"publish","type":"projects","link":"https:\/\/www.m4contracting.com\/de\/projects\/renovation-of-basement-under-the-main-building-of-the-presidential-palace\/","title":{"rendered":"Renovation of Basement under the Main Building of the Presidential Palace"},"content":{"rendered":"<p><strong>CLIENT :<\/strong><\/p>\n<hr \/>\n<p>Ministry of Presidential Affairs<\/p>\n<p><strong>DESCRIPTION :<\/strong><\/p>\n<hr \/>\n<p>Refurbishment works like Civil Finishes, Flooring and Ceiling with MEP Engineering Installations and External Developments<\/p>\n<p><strong>LOCATION :<\/strong><\/p>\n<hr \/>\n<p>Abu Dhabi, U.A.E<\/p>\n<p><strong>CONTRACTOR :<\/strong><\/p>\n<hr \/>\n<p>M\/s M4 Contracting S.A.R.L \u2013 Abu Dhabi<\/p>\n<p><strong>CONSULTANT :<\/strong><\/p>\n<hr \/>\n<p>Morganti<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Completed<\/p>\n","protected":false},"featured_media":877,"parent":0,"template":"","projects-categories":[5],"_links":{"self":[{"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/projects\/875"}],"collection":[{"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/media\/877"}],"wp:attachment":[{"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/media?parent=875"}],"wp:term":[{"taxonomy":"projects-categories","embeddable":true,"href":"https:\/\/www.m4contracting.com\/de\/wp-json\/wp\/v2\/projects-categories?post=875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}